ABC

S-market Turenki

Harvialantie 5, Janakkala Status unknown
Price from
30 ct/kWh
Available
– / 4
Max power
200 kW
Connector type
CCS
No real-time status Opening hours: not provided Nearby:

Pricing

Prices now · Finnish time · 11.10.2026
CCS · 200 kW 0.30 €/kWh

Additional fee (TIME): 6.00 € / hour · Fee duration limits (min): 720.0–∞

Additional fee (PARKING_TIME): 6.00 € / hour · Fee duration limits (min): 720.0–∞

Prices are estimates based on operator data. Membership, payment method and fees may affect the price. Check the final price before charging.

Charging points

Reported maximum voltage · Source voltage data may be missing or incorrect. Vehicle compatibility is not guaranteed.

CCS · 200 kW 4 points · fixed cable
  • 11
    Status unknown CCS · Reported maximum voltage: 800 V
  • 12
    Status unknown CCS · Reported maximum voltage: 800 V
  • 13
    Status unknown CCS · Reported maximum voltage: 800 V
  • 14
    Status unknown CCS · Reported maximum voltage: 800 V

Nearby services

Within 300 metres · straight-line distances

  • Kotipizza58 m

    Food

  • S-market77 m

    Groceries

  • K-Supermarket Turenki83 m

    Groceries

  • Lounas Sulo131 m

    Food

  • Lähetyskahvila Toivo134 m

    Café

  • Ravintola Bambu Oy165 m

    Food

  • Pikantti174 m

    Food

  • Café Laurell Turenki202 m

    Café

  • Food231 m

    Food

  • Food239 m

    Food

  • Forat Pizzeria240 m

    Food

  • Food241 m

    Food

  • Kesäterassi Lyylinpuisto248 m

    Café

  • Food248 m

    Food

  • Food258 m

    Food

  • Sandwich Bros260 m

    Food

© OpenStreetMap contributors

About this station

Operator
ABC
Opening hours
Not provided
Station identifier
FI-ABC-639153125831224214
Station data fetched
2026-10-10T22:46:17.287977+00:00

Operator-provided data · Digitraffic / Fintraffic (AFIR)Sources and licences

Nearby charging stations

All charging stations in Janakkala

Straight-line distance. Comparisons use known, unconditional energy prices (ct/kWh). Start, time and parking fees may apply. Membership and contract prices are excluded. Charging power is the point’s stated maximum. Availability may change before you arrive.

Report a problem